Skip to content

Strategic Building Upgrades Yield Big Savings for Texas School District

Rooftop HVAC units with multiple circular fans mounted on a commercial building.

Industry

Education

Challenge

A Texas school district needed to replace aging HVAC and building systems across multiple campuses but faced tight budgets and minimal tolerance for classroom disruption.

Results

NextEra Advisors planned and executed strategic upgrades that reduced energy and O&M costs, delivering up to $634K in savings over the life of the contract.

Product

Energy Solutions, Energy Efficiency, HVAC

$635k
total savings (over life of contract)*
8
distinct building and system upgrades
11
buildings upgraded

Challenge

In a multi-phase project, Mount Pleasant ISD desired to upgrade outdated equipment and building infrastructure to meet budgetary restrictions and limit disturbances in the K-12 learning environment. NextEra Advisors helped them plan and execute a path forward that could yield large savings while hitting District goals.

The project began with a comprehensive feasibility study of existing equipment for nine K-12 schools, encompassing 20 buildings. Some of the HVAC systems were reaching the end of their life-cycle, however, school budgets were limited and no funds were available to replace these aging systems.

Solution

NextEra Advisors and NextEra Energy Solutions designed and implemented a project that replaced aging equipment, improved the classroom environment and reduced the financial risk to Mount Pleasant Independent School District. The School District could save both energy and money while giving students and faculty brighter light levels, improved classroom comfort and increased security. Project design, analysis and construction was completed after hours and during semester breaks to limit disturbances in the classroom and downtime in critical areas.

Results

After working with the School District on equipment upgrades, such as new cooling towers, the NextEra Advisors team was able to lower the District’s energy consumption and lower operations and maintenance costs. Over the life of the contract, the District could be able to save $634,939.

Building upgrades included:

  • Building management system upgrade

  • Lighting retrofit

  • Pumping upgrades

  • Roof replacement

  • High efficiency DX air conditioners

  • Football field turf

  • Solar PV

  • Boilers and cooling towers

 *Savings may vary.
Engineering solutions and Energy Service Company (ESCO) projects conducted throughout the greater U.S. territories (outside of TX) are conducted by NextEra Energy Solutions, LLC. Engineering solutions and Energy Service Company (ESCO) projects conducted within TX are conducted through our regional affiliate brand Gexa Energy Solutions, LLC. Engineering COA’s: AL, ECA5720; AZ, 25021-0; CA; CO; DE, 4743; GA, PEF 008315; IL, 184.007794-0002; IN; LA, EF.0006974; MD, 51635; MA, 1231175; MS, 2021033096; NJ, 10606253; NM, 5512816; OH, COA.05360; OK, CA 8486; PA; TX, F-16231. NextEra Advisors does not provide engineering services.